Les amis du CENA
Melennec,Ronan
Notes
- N87-018: C/R RENCONTRE CENA/CELI DU 19.2.87
- N89-033: NOTE ON THE HARDWARE REQUIREMENTS FOR THE EFMS DEVELOPMENT
- N89-179: ETUDE DES PRINCIPAUX SYSTEMES GRAPHIQUES POUR LES BESOINS PHIDIAS.
- NT96-139: PROPOSITION DE MISE EN SERVICE D'UNE LIAISON TRANSFIX-CENA/STNA
- NA96-230: COMMANDE VGAP/STATIONS SUN
- NA96-281: RAPPORT DE PRESENTATION-COMMANDE UGAP STATIONS SUN ULTRASPARC ET PERIPHERIQUES
- NT96-329: UTILISATION PAR LE CIB DE L'ACCES INTERNET DU CENA
- N97-141: RAPPORT DE PRESENTATION-COMMANDE UGAP D'UN SERVEUR SUN E3000 ET 2 STATIONS SUN SPARC 5
- NA98-110: COMMANDE UGAP POUR LE REMPLACEMENT DE QUATRE STATIONS SUN SPARC
- NT98-144: COMPTE-RENDU DE LA REUNION "ARCHIVAGE" DU 12 JUIN 1998
- NT98-169: COMPTE-RENDU DE LA REUNION SEGA DU 31 JUILLET 1998
- NT99-137: COMPTE RENDU DE LA REUNION SEGA (VISIOCONFERENCE) DU 28 SEPTEMBRE 1999
- NA01-208: CCTP DU MARCHE : DEVELOPPEMENT D'OUTILS LOGICIEL ET REALISATION D'ETUDES POUR L'ATFM
- NA01-591: COMPTE-RENDU DE LA REUNION SUR LA REDUCTION DU TEMPS DE TRAVAIL AU CENA DU 7 MARS 2001
- NA03-200: ANNEXE TECHNIQUE DE BC (MARCHE 02.19.006) : APPLICATION D'UNE METHODE DEPENDANCES,PROTECTIONS,LIMITATIONS ET COMPARAISON AVEC LES RESULTATS DE L'EXPERTISE DES FMP.
- NA04-081: AVENANT NUMERO 1 AU CCTP CENA/NA01-208
- NA04-099: RAPPORT DE PRESENTATION DE L'AVENANT N.1 AU MARCHE CENA N.02.19.006
- NT04-233: IMPORTANCE DE LA COLLECTE DE DONNEES EUROPEENNES
- NA04-261: CCTP PRESTATIONS DE DEVELOPPEMENT INFORMATIQUE ET DE REALISATION D'ETUDES POUR LA GESTION DES FLUX DE TRAFIC AERIEN.
- NA04-265: ANNEXE TECHNIQUE DU BC 08/04 DU MARCHE D'ERGONOMIE 01.19.024
- NT04-277: COMPTE-RENDU DE LA VISIOCONFERENCE DONNEES CFMU--DU 9 DECEMBRE 2004
- NA05-072: CCTP PRESTATIONS D'ERGONOMIE RELATIVES A LA GESTION DES FLUX DE AERIEN
- NA05-080: ANNEXE TECHNIQUE DU BC 05/05 DU MARCHE ATFM 02.19.006
- NA05-126: ANNEXE TECHNIQUE DU BC 06/05 DU MARCHE ATFM 02.19.006
- NA05-154: ANNEXE TECHNIQUE DU BC 07/05 DU MARCHE ATFM 02.19.006
- NA05-249: ANNEXE TECHNIQUE DU BC 01/05 DU MARCHE ATFM 05.19.008
- NA05-250: ANNEXE TECHNIQUE DU BC 02/05 DU MARCHE ATFM 05.19.008
- NA05-360: DEVELOPPEMENT ET ETUDES POUR LA GESTION DES FLUX DE TRAFIC AERIEN-MARCHE 05.19.008-ANNEXE TECHNIQUE DU BON DE COMMANDE 03/05
- NA06-003: ANNEXE TECHNIQUE DU BC 01/06 DU MARCHE ATFM 05.19.008
- NA06-103: ANNEXE TECHNIQUE DU BC 02/06 DU MARCHE ATFM 05.19.008
- NA06-167: ANNEXE TECHNIQUE DU BC 03/06 DU MARCHE ATFM 05.19.008
- NA06-209: ANNEXE TECHNIQUE DU BC 04/06 DU MARCHE ATFM 05.19.008
- NA06-230: PROPOSITION TECHNIQUE POUR TMA DO NOTHING ASSESSMENT (EPISODE 3)
- NA06-242: ANNEXE TECHNIQUE DU BC 05/06 DU MARCHE ATFM 05.19.008
- NA06-248: TMA DO NOTHING ASSESSMENT--TMA-D0.A-WORK PLAN
- NT06-300: EXPERIMENTAL PLAN FOR TMA DO NOTHING ASSESSMENT
- NA06-302: ANNEXE TECHNIQUE DU BC 06/06 DU MARCHE ATFM 05.19.008
- NA07-004: ANNEXE TECHNIQUE DU BC 01/07 DU MARCHE ATFM 05.19.008
- NA07-005: ANNEXE TECHNIQUE DU BC 03/06 DU MARCHE ATFM 05.19.008
- NA07-040: ANNEXE TECHNIQUE DU BC 03/07 DU MARCHE ATFM 05.19.008
- NA07-050: ANNEXE TECHNIQUE DU BC 04/07 DU MARCHE ATFM 05.19.008
- NA07-064: ANNEXE TECHNIQUE DU BC 05/07 DU MARCHE ATFM 05.19.008
- NA07-098: ANNEXE TECHNIQUE DU BC 06/07 DU MARCHE ATFM 05.19.008
Retour à la page principale
Pour toute demande d'aide, d'information ou d'accès, veuillez vous reporter au forum du site..