Les amis du CENA
Coeffe,Christian
Notes
- N89-115: ELEMENTS RELATIFS AUX TEMPS DE REPONSE DANS UN DIALOGUE CONTROLEUR-SYSTEME.
- R89-020: RESULTATS DE LA PREMIERE EXPERIMENTATION "INTEGRATION D UNE POSITION RADAR" SUR BANC DE TEST ACTIF
- N90-145: POSITION RADAR A UN OU DEUX ECRANS : PROPOSITION D UN PLAN D EXPERIMENTATION
- N90-230: PREMIERE INTEGRATION D UNE POSITION COMPLETE : SPECIFICATIONS REALISEES POUR L INTERFACE CO ET CR
- R90-016: RESULTATS DE L'EXPERIMENTATION POSITION CONTROLEUR RADAR A 1 OU 2 ECRANS
- N91-240: FAISABILITE D'UN FORMALISME DE DESCRIPTION D'INTERFACES
- N92-110: LA GESTION DES ETATS DE VOLS/FLASH
- N92-181: DOSSIER CONSULTATION PROJET FLASH
- N92-185: PROPOSITION ETUDE SYNTHESE C.A. ELEVE IENAC/S90
- N92-219: CCTP MARCHE FOURNITURES ILOG
- N92-220: DOSSIER DE PRESENTATION/MARCHE FOURNITURES ILOG
- N92-257: NOTE DE PRESENTATION POUR UN MARCHE DE MAINTENANCE ILOG
- N93-019: BILAN FLASH 92 ET PERSPECTIVES
- N93-051: FLACH : ARCHITECTURE MATERIELLE ET LOGICIELLE
- N93-052: A SHORT OVERVIEW OF FLASH
- N93-070: NOTE PRESENTATION 1ERE AVENANT AU MARCHE DE MAINTENANCE ILOG
- N93-126: CCTP DEVELOPPEMENT MAQUETTE FLASH
- N93-322: CCTP POUR LE DEVELOPPEMENT DE MAQUETTES FLASH
- N93-678: MAQUETTE DATA LINK
- R93-008: SPECTACLE : SPECIFICATIONS OPERATIONNELLES PARTIE 1
- R93-009: SPECTACLE : SPECIFICATIONS OPERATIONNELLES PARTIE 2
- R93-015: SPECTACLE : SPECIFICATIONS OPERATIONNELLES PARTIE 3
- N94-024: COMPTE RENDU DE LA REUNION AFFAIRES EUROPENNES DU 14.01.94
- N94-088: COMPTE RENDU REUNION AFFAIRES EUROPEENNES DU 24/03/94
- N94-209: COMPTE RENDU REUNION AFFAIRES EUROPEENNES DU 01 07 94
- NT95-081: WMH METHODOLOGY PRESENTATION ORALE HCI 95 TOKYO
- NT95-100: R/REUNION PHARTE X STEERING COMMITTEE
- NT95-146: COMPTE RENDU REUNION AFFAIRES EUROPEENNES DU 12/05/95
Retour à la page principale
Pour toute demande d'aide, d'information ou d'accès, veuillez vous reporter au forum du site..