Les amis du CENA
Arino,Thierry
Notes
- N93-592: SPECIFICATIONS TECHNIQUES GENERATEUR RENCONTRES THEORIQUES
- N93-606: SPECIFICATIONS TECHNIQUES MODULE OSCAR
- N93-765: SPECIFICATIONS TECHNIQUES-REPONSES D'OSCAR AUX ORDRES DE LA LOGIQUE ACAS
- N94-672: JEU DES MOPS 6.0 ET 6.04A SUR OSCAR
- N94-725: COMPTE-RENDU DE REUNION DIVISION SAS DU 30.08.94
- N94-810: INTRODUCTION OF A HORIZONTAL MISS DISTANCE FILTER IN THE TCAS 2 LOGIC SICASP/WG2
- N94-852: COMPTE RENDU DE REUNION DIVISION SAS DU 19/12/94
- NR95-553: ANALYSIS OF RA REDUCTION RATES DUE TO HMD FILTERING EXTRACTED FROM FRENCH RADAR DATA
- NR95-554: CONTRIBUTION OF WEAKENING RAS AND PILOT REACTIONS ON DEVIATIONS
- NR95-555: A THEORETICAL EXAMPLE OF A COLLISION INDUCED BY TCAS 2 LOGIC
- NA95-556: COMPTE RENDU DE REUNION DIVISION SAS DU 24 FEVRIER 1995
- NA95-592: COMPTE RENDU DU 22EME SICASP WORKING GROUP II A SYDNEY (20 AU 24/3/95)
- NT95-717: TRAITEMENT DES STABILISATIONS A 1000 PIEDS PAR LA LOGIQUE TCAS 2 VERSION 6.04A
- NR95-724: PRELIMINARY COMMENTS ON ACAS SIMULATIONS PERFORMED ON THE UM DATA BASE
- NR95-725: EFFECTIVENESS OF TCAS 2 VERSION 6.04A LOGIC ON LEVEL-OFF GEOMETRIES IN THE FRENCH AIRSPACE
- NA95-733: COMPTE RENDU DE LA REUNION DE DIVISION SAS DU 25/07/95
- NR95-766: ANALYSIS OF DEVIATION REDUCTION RATES DUE TO RA DURATION SHORTENING EXTRACTED FROM FRENCH AND UK AIRSPACES
- NR95-828: TCAS 2-LOGIC INCLUDING AN EARLIER CLEAR OF CONFLICT MECHANISM
- NA95-843: COMPTE RENDU DU 23EME SICASP - GROUPE DE TRAVAIL WG2
- NA95-930: COMPTE RENDU DE REUNION DE DIVISION SAS DU 22/12/95 (NUMERO 37)
- NA96-521: CRR DU SICASP/WG2/SOUS-GROUPE "LOGIQUE ACAS" DU RTCA/RWG ET DU RTCA/OWO
- NR96-613: OPERATIONAL PERFORMANCES OF CHANGE 7 RELEASE 7 IN FRENCH AND UK AIRSPACES
- NR96-626: CALCULATION OF TBDS FOR THE PERFORMANCE-ORINETED SARPS
- NR96-647: A BRIEF ANALYSIS OF THE STANDARD ENCOUNTER MODEL PROPOSED IN FRANKFURT
- NT96-667: COMPTE RENDU DU 24EME SICASP/GROUPE DE TRAVAIL WG2 (LONDRES,22-26 AVRIL 1996)
- NA96-725: TECHNICAL AND FINANCIAL PROPOSAL TCAS II CHANGE 7 ASSESSMENT
- NA96-726: TECHNICAL AND FINANCIAL PROPOSAL CONTRIBUTION OF ACAS HORIZONTAL MANOEUVRE
- NR96-831: OPERATIONAL PERFORMANCE OF TCAS 2 LOGIC CHANGE 7 RELEASE 8 IN THE EUROPEAN AIRSPACE
- NA96-847: CRR DE DIVISION SAS (N. 45) DU 16.09.96
- NR96-869: UPDATED CALCULATION OF TBDS FOR THE PERFORMANCE-ORIENTED SARPS
- NR96-873: STATUS REPORT OF THE CRS-BASED TESTS FOR TCAS 2 LOGIC VERSION 7.0 RELEASE
- NA96-923: CR DU 25EME SICASP GROUPE DE TRAVAIL WG2-NAGOYA,28 OCTOBRE-01 NOVEMBRE 1996
- NA96-959: ACAS STUDY PROPOSAL-EVALUATION OF TCAS 2-VERSION 7.0 IN EUROPEAN AIRSPACE
- NR97-525: CHANGE 7 EVALUATION UNRESOLVED AN INDUCED COLLISIONS DUE TO THE CURRENT MISE DISTANCE FILTER IMPLEMENTATION : THE PARALLEL APPROACH EXAMPLE
- NR97-534: TBDS FOR THE PERFORMANCE ORIENTED SARPS
- NR97-562: CHANGE 7 EVALUATION-A PROPOSAL TO REDUCE UNDESIRABLE SECONDARY RAS AND TO MAINTAIN THE SAME PERFORMANCE LEVEL IN TERMS OF VERTICAL DEVIATION
- NA97-564: CR 6EME REUNION PLENIERE DU GROUPE D'EXPERTS SICASP-MONTREAL,10-19 FEVRIER 1997
- NR97-600: CHANGE REQUEST TO RTCA DO-185A : PROPOSAL TO REDUCE SPLIT RAS
- NR97-640: CHANGE REQUEST TO RTCA DO.185A-PROPOSAL TO IMPROVE SAFETY
- NA97-653: CR DE LA 53EME REUNION DU COMITE SC147 DU RTCA-WASHINGTON 27-30 MAI 1997
- NR97-662: SAFETY COMPARISON OF TCAS 2 LOGICS-VERSION 6.04A AND CHANGE 7-USING THE ICAO STANDARD ENCOUNTER MODEL
- NA97-669: CR 53EME REUNION DE DIVISION SAS DU 10 JUIN 1997
- NA97-712: ACAS STUDY PROPOSAL-EVALUATION OF TCAS 2 VERSION 7.0 IN EUROPEAN AIRSPACE
- NA97-734: CR DE LA 26EME REUNION DU GROUPE DE TRAVAIL WG2 DU GROUPE D'EXPERTS SICASP DE L'OACI-OTTAWA 23-27 JUIN 1997
- NR97-791: PRELIMINARY CONTRIBUTION FOR TLSE ACAS III PERFORMANCE SARPS
- NA97-818: EUROPEAN ACAS STUDY MAIN DOMAINS OF INTEREST FOR CENA
- NA97-847: CPTE RENDU DE LA 27ME REUNION DU GROUPE DE TRAVAIL WG2 DU GROUPE D'EXPERTS SICASP DE L'OACI (HONOLULU 20/24 OCT 97)
- NA97-900: TEN PROJECT. WORK PLAN FOR WR3 WP6 AND WP8.
- NT98-503B: EUROPEAN ACAS & RVSM STUDY ACAS ECAC RVSM STUDY WORK PLAN
- NA98-543: AN APPROACH TO RESOLVE THE INCONSISTENCY IN THE SAFETY STUDY RESULTS FOR THE PERFOMANCE SARPS
- NA98-556: CPTE RENDU DE LA 60ME REUNION DE DIVISION ASAS DU 27 02 98
- NA98-603: CR DE LA 28ME REUNION DU GROUPE DE TRAVAIL WG2 DU GROUPE D'EXPERTS SICASP DE L'OACI TLSE 06/10 AVRIL 98
- NR98-660: CNR. CONTRIBUTION TO SICASP WORKING GROUP 2. POSITION PAPER ON THE USE OF ADS B DATA FOR ASAS.
- NR98-726: ACASA WP1.ACAS SAFETY STUDY FOR THE EUROPEAN AIRSPACE INCLUDING PERFORMANCE ACAS WP1 ACAS SAFETY STUDY FOR THE EUROPEAN AIRSPACEINCLUDING PERFORMANCE LIMITATIONS OF AIRCRAFT
- NA98-728: RAPPORT FINAL D'ACTIVITE. TACHE 1 RELATIVE A L'EVALUATION DES PERFORMANCES DE LA VERSION 7 DU TCAS II
- NR98-772: SAFETY ISSUES DELAYING THE RELEASE OF THE TCAS VERSION 7.0 TECHNICAL ORDER
- NA98-787: COMPTE-RENDU DE LA 67EME REUNION DE LA DIVISION SAS DU 26 OCTOBRE 1998
- NA98-802: COMPTE-RENDU DE LA 29EME REUNION DU GROUPE DE TRAVAIL WG2 DU GROUPE D'EXPERTS SICASP DE L'OACI (BRUXELLES 19-23 OCTOBRE 1998)
- NA98-820: COMPTE-RENDU DE LA REUNION DE DEMARRAGE DU PROJET ACASA DU 26 NOVEMBRE 1998.
- NA98-839: WP-11 MINUTES OF DERA'S VISIT TO CENA (7-10 DECEMBER 1998)
- NA98-849: WP-3 : MINUTES OF THE KICK-OFF MEETING (17 DECEMBER 1998)
- NR99-501: W.P 3.6 SPECIFICATION OF STUDY CONTEXT
- NA99-534: WP-CENA PROGRESS REPORT
- NA99-535: WP-3 MINUTES OF THE 2ND MEETING.
- NT99-586: WP-10 CENA PROGRESS REPORT
- NT99-588: RISK IDENTIFICATION BY CENA
- NT99-600: WP-3-MINUTES OF THE 3RD MEETING (15 MARCH 1999)
- NT99-603: COMPTE-RENDU DE REUNION AEROSPATIALE / AIRBUS /CENA
- NR99-650: OWN VERTICAL TRACKER ISSUE WITH TCAS II LOGIC VERSION 7.0
- NT99-671: CENA-SOFREAVIA PROGRESS REPORT (BRETIGNY,1 & 2 JUNE 1999)
- NT99-687: COMPTE-RENDU DE LA 73EME REUNION DE LA DIVISION SAS DU 27 MAI 1999
- NT99-704: WP-3 MINUTES OF THE 4TH PROGRESS MEETING
- NT99-710: CENA/SOFREAVIA REVISED ESTIMATE
- NT99-722: COMPTE-RENDU DE LA 30EME REUNION DU GROUPE DE TRAVAIL WG 2 DU GROUPE D'EXPERTS SICASP DE L'OACI
- NT99-731: EUROPEAN TOOL FOR MODE S MONITORING OF ACAS: DRAFT USER REQUIREMENTS
- NT99-736: THE ACASA PROJECT: CURRENT STATUS AND MAIN CONCERNS
- NT99-740: WP-1.1: STATUS ON THE REPETITION OF THE ICAO RISK RATIO CALCULATIONS BY CENA/SOFREAVIA
- NT99-790: UPDATED STATUS ON THE REPETITION OF THE ICAO RISK
- NT99-793: CONTRIBUTION TO THE ASAS MANUAL-PARAGRAPH 9: OPERATIONAL CONSIDERATIONS
- NT99-794: CENA/SOFREAVIA PROGRESS REPORT
- NT99-809: WP-3-MINUTES OF THE 5TH PROGRESS MEETING
- NT99-845: SOME CONSIDERATIONS ON THE ENCOUNTER MODEL EFFECT ON RISK RATIO FIGURES
- NT99-864: COMPTE-RENDU DE LA 31EME REUNION DU GROUPE DE TRAVAIL WG 2 DU GROUPE D'EXPERTS SICASP DE L'OACI
- NT99-871: ACASA WP-10-CENA/SOFREAVIA PROGRESS REPORT
- NT99-880: REVIEW OF DRAFT FAULT TREE
- NT99-886: WP-3-MINUTES OF THE 6TH PROGRESS MEETING
- NT00-543: CENA/SOFREAVIA PROGRESS REPORT
- NT00-602: COMPTE-RENDU DE LA 32EME REUNION DU GROUPE DE TRAVAIL WG 2 DU GROUPE D'EXPERTS SICASP DE L'OACI
- NT00-605: MINUTES ON WP-3 ACTIVITIES UNTIL 15 FEBRUARY 2000
- NT00-607: WP-10-CENA PLANS ON ACASA TIME SCALES
- NT00-627: WP-10-CENA/SOFREAVIA PROGRESS REPORT
- NT00-670: MINUTES ON WP-3 ACTIVITIES UNTIL 12 MAY 2000
- NT00-688: WP-1.7 REVISED WORK PLAN
- NT00-691: CENA/SOFREAVIA PROGRESS REPORT (FRANKFURT,26 & 27 JUNE 2000)
- NA00-704: COMPTE-RENDU DE LA 83EME REUNION DE LA DIVISION SAS
- NT00-716: MINUTES ON THE WP3 ACTIVITIES UNTIL 30 JUNE 2000
- NT00-806: CENA/SOFREAVIA PROGRESS REPORT (SEPTEMBER 2000)
- NT00-812: MINUTES ON WP-3 ACTIVITIES UNTIL 29 SEPTEMBER 2000 (10TH MEETING)
- NT00-861: COMPTE-RENDU DE LA 7EME REUNION PLENIERE DU GROUPE D'EXPERTS SICASP DE L'OACI
- NT00-872: CENA/SOFREAVIA PROGRESS REPORT
- NT00-893: MINUTES ON WP-3 ACTIVITIES UNTIL 23 NOVEMBER 2000
- NT01-555: CENA/SOFREAVIA PROGRESS REPORT
- NT01-571: MINUTES ON WP-3 ACTIVITIES UNTIL 15 FEBRUARY 2001
- NT01-634: REPORT ON THE EFFECT OF IMPERFECT SURVEILLANCE PERFORMANCE ON THE EFFICACY OF ACAS
- NT01-647: COMPTE-RENDU DE LA 1ERE REUNION DU GROUPE DE TRAVAIL A DU GROUPE D'EXPERTS SCRSP DE L'OACI
- NA01-674: COMPTE-RENDU DE LA 93EME REUNION DE DIVISION SAS DU 11 MAI 2001
- NT01-919: COMPTE-RENDU DE LA 2EME REUNION DU GROUPE DE TRAVAIL WG A DU GROUPE D'EXPERTS SCRSP DE L'OACI
- NT02-601: COMPTE-RENDU DE LA 3EME REUNION DU GROUPE DE TRAVAIL WG A DU GROUPE D'EXPERTS SCRSP DE L'OACI
- NA02-780: COMPTE-RENDU DE LA 105EME REUNION DE LA DIVISION SAS
- NT03-575: COORDINATION DES PROJETS ASAS DE LA DIVISION SAS
- NT03-983: ICAO SCRSP WGA MEETING N.6 IN HONOLULU
- NT04-1030: ICAO SCRSP/1 PANEL MEETING (8 TO 19 NOVEMBER 2004)
- NT04-1080: RTCA SC147 IN PHOENIX (7-9 DEC 2004)
- NA04-596: COMPTE-RENDU DE LA 118EME REUNION DE LA DIVISION SAS DU 6 FEVRIER 2004
- NT04-761: ICAO SURVEILLANCE AND CONFLICT RESOLUTION SYSTEMS PANEL-WGA MEETING N.7 IN MONTREAL (3 TO 7 MAY 2004)--
- NT04-762: RTCA SPECIAL COMMITTEE SC147-PLENARY MEETING N.57 IN WASHINGTON (11 TO 13 MAY 2004)
- NT04-775: PROJET IAPA
- NT05-519: CR DEBRIEFING DE LA REUNION SCRSP/1 AVEC L'INDUSTRIE
- NT05-595: RTCA SC147 RWG IN BOSTON (8,9 & 10 MARCH 2005)
- NT05-671: RTCA SC147 RWG MEETING IN BRUSSELS (MAY 2005)
- NT05-699: ICAO SCRSP WGA MEETING N.8 IN BRISBANE--
- NT05-741: RTCA SC147 RWG IN WASHINGTON (21 & 22 JUNE 2005) & RTCA SC147 PLENARY MEETING N.59 IN WASHINGTON (23 JUNE 2005)----
- NA05-809: COMPTE RENDU DE LA 131E REUNION DE LA DIVISION SAS DU 9 SEPTEMBRE 2005--
- NT05-839: RTCA SC147 IN WASHINGTON (27-29 SEPTEMBER 2005)
- NT05-860: ICAO SURVEILLANCE AND CONFLICT RESOLUTION SYSTEMS PANEL-WGA MEETING N.9 IN PARIS (10 OCTOBER TO 14 OCTOBER 2005)--
- NT05-939: RTCA SPECIAL COMMITTEE SC147 MEETING IN WASHINGTON (29,30 NOVEMBER & 1 DECEMBER 2005)--
- NT06-660: RTCA SC147 RWG,OWG,PLENARY APRIL 2006--MEETING NOTES--
- NA06-665: PROGRAMME DE TRAVAIL DE LA DIVISION SAS POUR 2006
- NT06-863: RTCA SC147-RWG,OWG,PLENARY-OCTOBER 2006-MEETING NOTES--
- NT07-576: RTCA-SC147/EUROCAE WG75 MEETING NOTES FEBRUARY 07
- NT07-670: RTCA SC147 / EUROCAE WG75--RWG,OWG,PLENARY MAY 2007-MEETING NOTES--
Retour à la page principale
Pour toute demande d'aide, d'information ou d'accès, veuillez vous reporter au forum du site..