Les amis du CENA
Bacsich,Jean-pierre
Notes
- N77-024: C/R REUNION DU GROUPE DE TRAVAIL HAP 14.11.17
- N77-032: C/R REUNION HAP
- N77-039: REUNION DU GROUPE DE TRAVAIL HAP DU 21.03.7
- N77-047: C/R REUNION DU GROUPE HAP DU 7.4.77
- N77-061: REUNIONS GROUPE DE TRAVAIL HAP
- N78-084: C/R MISSION DES 4 ET 5 OCTOBRE A TOULOUSE CONCERNANT LA SIMULATION HAP
- N78-106: CONSIGNES DE LA SIMULATION HAP.ENAC 15.26/01/79
- N79-088: C/R REUNION DU 04.09.79,IMPACT DE LA FONCTION HAP SUR LES ECHANGES DE [...] CAUTRA III PARIS-CAUTRA IV REIMS
- N79-096: C/R REUNIONS 4 ET 23.09.79.IMPACT DE LA FONCTION HAP SUR LES ECHANGES DE [...] CAUTRA III PARIS-CAUTRA IV REIMS
- N79-101: PREVISION D'UTILISATION DES STACKS ELOIGNES
- R79-008: C/R DE LA SIMULATION HAP
- N80-042: LE PROCESSUS HAP
- N80-128: UTILISATION DES STACKS ELOIGNES DE LA TMA PARIS A L'HORIZON 85
- N81-047: LE DIMENSIONNEMENT VERTICAL DES STACKS ELOIGNES D'ORLY A LONG TERME
- N81-077: ANALYSE DES DELAIS A L'ARRIVEE AU MOIS DE JUIN 81 A ORLY ET CHARLES DE GAULLES
- N82-072: INFLUENCE DE L'UTILISATION SIMULTANEE DE DEUX PISTES A L'ATTERRISSAGE [...] LES TEMPS D'ATTENTE A L'ARRIVEE
- R82-030: CALCUL AUTOMATIQUE DES HEURES D'APPROCHE PREVUE (ANALYSE FONCTIONNELLE)
Retour à la page principale
Pour toute demande d'aide, d'information ou d'accès, veuillez vous reporter au forum du site..